Boston Consulting Group
CMF was under contract to design, fabricate, and install 3 stairs, each with a unique design using custom fabricated metal panels and glass. The 3 stairs featured either custom precast concrete or custom wood treads. Since the time frame from design to installation was 4 months, an aggressive schedule needed to be created and strictly adhered to. As a last minute add-on, CMF was asked to fabricate a blackened steel sliding barn door unique in that it had to be both lightweight and sound deadening.